Rough clean
During or just after construction: debris removal, sweeping, and clearing the large material so remaining trades can work and the space becomes assessable.
Post construction cleaning in Minneapolis
Drywall dust does not get cleaned once. It settles, you clean it, and it settles again. Getting that sequence wrong is why handovers slip.
Why this is its own trade
Drywall dust is fine enough to settle into every horizontal surface, work into vents and light fixtures, and reappear on surfaces you cleaned yesterday. Add adhesive residue, paint overspray, joint compound, sawdust, and the manufacturer stickers and protective film on every fixture and pane of glass.
Ordinary cleaning methods do not resolve that, and some make it worse. Wiping fine dust with a damp cloth smears it into a film on new glass. The wrong solvent on a new finish causes damage that is expensive on a building nobody has occupied yet. Cleaning low before high means doing the floors twice.
So the work happens in phases: a rough clean to clear debris so remaining trades can work, a top-down dust removal and final detail to bring the space to occupancy standard, and a touch-up immediately before walkthrough because dust keeps settling after the main clean.
What is included
The scope is built for your building. These are the areas most post construction cleaning plans cover, and you set the frequency of each during the walkthrough.
During or just after construction: debris removal, sweeping, and clearing the large material so remaining trades can work and the space becomes assessable.
Ceilings, vents, light fixtures, ledges, and frames worked from high to low so settled dust is not simply relocated onto surfaces already cleaned.
Fixtures, cabinetry, doors and frames, switch plates, and all interior surfaces brought to occupancy standard, with residue removed rather than smeared.
Manufacturer stickers, protective film, adhesive residue, paint overspray, and compound removed from glass, frames, fixtures, and appliances.
Floors vacuumed, scrubbed, and finished according to surface, including the first protective coat on new hard flooring where specified.
A final pass immediately before walkthrough or move-in, because dust continues settling after the main clean and the space must look right on the day.
How we approach it
The hardest part of post construction cleaning is rarely the cleaning. It is that the schedule moves. Trades run late, inspections get rescheduled, and the cleaning window compresses because it sits at the end of the sequence. A cleaner who can only work a fixed slot becomes the reason a handover slips.
We schedule this work expecting the date to change: confirming the window close to the date, staying reachable as it moves, and bringing appropriate crew size when the window is short. For phased projects we clean by area so finished sections can be handed over while work continues elsewhere.
It also means being honest about sequence. If the trades are not finished, a final clean is wasted, because the next work order puts the dust straight back. We will tell you when a rough clean now and a final clean later is the right split rather than taking the booking twice.
Who we work with
Office and retail fit-outs where the space must be handover-ready on the lease date.
Ground-up buildings needing rough, final, and touch-up phases coordinated with the construction schedule.
Clinical spaces with a higher finish standard and stricter residue and dust requirements before occupancy.
Customer-facing spaces on a fixed opening date where the deadline does not move.
Occupied buildings undergoing partial renovation, where the working areas must stay clean and separated from the work.
Phased projects handed over in sections rather than all at once.
Common questions
A rough clean happens during or just after construction and clears debris so remaining work can proceed. The final clean brings the space to occupancy standard: detail dust removal, fixtures, glass, residue and floors.
As close as practical, ideally with a touch-up on the day or the day before. Fine dust keeps settling for a while after construction, so a final clean done too early does not hold.
Yes. Manufacturer stickers, film, adhesive residue and overspray on glass, fixtures and appliances are part of the final clean, using methods appropriate to each surface.
Yes. On phased projects we clean by area so finished sections can be handed over while work continues. We will advise when a final clean should wait rather than be done twice.
We handle cleaning-related debris and material. Large construction waste and dumpster logistics are normally the contractor's, and we confirm that boundary in writing before starting.
Other services
Service area
Based in Minneapolis and serving communities across the Twin Cities metro.
Get started
Tell us about your building and how it is used. We walk the space, put the scope in writing, and give you a price with no guesswork.
Get a quote
Tell us about your building and how it is used. We walk the space, put the scope in writing, and give you a price with no guesswork. We reply to every enquiry.
Prefer to talk? Call (612) 445-4217
Or email [email protected]
We use your details only to respond to this enquiry.